Book a free consult

For journeyman pipefitters

Stay on the tools. Drop the clipboard.

Mission runs the daily reports, timesheets, requisitions, and RFI chasing so you keep building and your area stays on schedule.

Your day

The layout is yours. The paperwork is the tax.

Reading the print, routing the run in 3D, and making a joint that passes test the first time — that’s the craft. Everything around it eats the rest.

40%Admin & coordination tax

Daily reports, crew timesheets, material requisitions, RFI write-ups, status relays, and re-keying the same job header every day.

60%Layout, fabrication & field judgment

Scaling prints, laying out distribution, fabricating and joining pipe, routing around clashes, pressure-testing, and bringing up apprentices.

What it costs

A stalled fitter is paying journeyman wages to stand still.

Paperwork burns skilled-wage hours, late or wrong fittings leave the crew waiting, and a clash caught late turns into a six-figure reroute.

Up to 60 min/day
On paperwork

A lead carrying a 4–8 person crew loses skilled-wage time daily to reports, timesheets, and requisitions — with office re-entry behind it.

1–3 weeks
RFI turnaround

Complex technical RFIs can take one to three weeks, so the crew works around the gap or waits on the answer.

$30k–$150k
Per late clash

A coordination clash found in the field instead of on paper drives a major reroute change order and days of stacked-trade delay.

TodayIdle on a stallWith Mission

With Mission: The admin loop runs itself, so the shift goes to layout and fabrication.

Where a lead man’s shift actually goes.

What Mission does

It carries the loop, you make the calls.

Mission works inside Procore or Contractor Foreman — drafting, routing, confirming, and chasing — and never invents a quantity. You approve, it files.

Step 01

Assembles the daily report

Pre-fills the log header — job, date, weather, crew — and drafts the narrative from your quick voice notes and photos for one-tap approval.

The result

No more end-of-day paperwork after a full day on the tools.

The fittings show up before you run out, the RFI gets chased without you, and your area stays the pacing item the GC can count on.

Today

The clipboard rides on your back

  • Re-keying the same job header onto every form at end of shift
  • Crew standing while a fitting nobody ordered gets chased down
  • An open RFI stalls the run and the schedule slips to you

With Mission

You stay on the line

  • The daily report drafts itself from your notes and waits for one tap
  • Requisitions filed and confirmed before the crew runs short
  • RFIs and status pings handled, so you only see the answer
Up to 60 min/day
Back on the tools

Skilled-wage time returned to layout and fabrication instead of forms and office re-entry.

Fewer stalls
Crew kept moving

Proactive delivery tracking and RFI follow-up keep journeymen productive instead of idle.

On schedule
Pacing item protected

Rough-in stays ahead so downstream trades — and the GC’s schedule — don’t absorb your delays.

Safe by default

You approve every move before it leaves the field.

Mission drafts, routes, and chases — but never invents a quantity or files a report you haven’t signed off on. Every action is logged and reversible.

Connected

Works inside the tools you already run on — email, calendars, sheets, your CRM, your portals.

Approved

Anything risky or off-mission is held for your sign-off before it touches data or goes out the door.

On mission

You set the assignment once. The work stays on it for days and weeks without drifting.

Observable

You always have a clear view of what ran, what changed, and what needs a call — no transcript spelunking.

Put the clipboard down and pick the tools back up.

Mission carries the daily reports, requisitions, and RFI chasing so you can do the part only a fitter can.