Book a free consult

For HVAC project coordinators

Sequence the work. Stop the chasing.

Mission runs the submittal chasing, delivery-date reconciliation, and look-ahead assembly so you stay ahead of every job.

Your day

You’re the hub the whole job runs through.

You sit between the PM, the foremen, the GC, the equipment reps, and the AHJ — and every fact flows through you in email, texts, and PDFs all day. Sequencing crews, deciding which slipped long-lead unit to expedite, and reading the GC’s timeline is where the job is saved or lost. Re-keying the same delivery date into three systems and chasing a submittal for the third time is the part that keeps you at your desk instead of ahead of the schedule.

35%The administrative tax

Updating the submittal log, re-keying ship dates into the tracker and Procore, chasing approvals and vendor confirmations, filling permit applications and tracking them across AHJ portals, logging RFIs and change orders, and routing the same status update to five different parties. On a heavy submittal-and-procurement week it tips closer to half.

65%The judgment

Sequencing crews across multiple jobs against GC timelines, deciding which long-lead item to expedite when two slip at once, negotiating realistic install dates with foremen and GCs, deciding whether a slip is a phone call or a change order, and protecting the schedule from cascading trade delays — hard-won, relationship-driven work.

What it costs

Mechanical sits on the critical path. The chasing slows you down on it.

A single late RTU can stall multiple trades, and an idle crew is the most expensive failure on the job. Because so much of the role is manual chasing and re-keying, one coordinator can only ride so many jobs before something falls through the cracks — an admin ceiling on the whole contractor’s throughput.

30–40%
of submittals rejected on first review

Directional industry figure — each rejection averages roughly $805 and adds 2–4 weeks, and the chasing and re-noticing is all manual coordinator work.

16–20+ wks
lead time on long-lead HVAC equipment

RTUs, AHUs, and chillers carry 16–20+ week manufacturing lead times — a 3-week approval slip can push an order into the next production slot and add months.

~$805
and 2–4 weeks per rejected submittal

Directional, vendor-sourced — across a portfolio of jobs, the cost of slow, error-prone submittal handling compounds fast.

First-pass rejectionEquipment lead timeWith Mission

With Mission: With the chase and re-key carried, you ride more jobs without the desk time, same headcount.

Where the slips come from — and what carrying the chase gives back.

What Mission does

It runs the chase-and-update loop. You keep the sequencing decisions.

You assign the workflow once. Mission’s agent watches the submittal log, reconciles ship dates against the schedule, drafts the re-sequenced look-ahead, and tracks permits across portals — while the sequencing calls, the escalations, and every final approval stay with you.

Step 01

Runs submittal follow-up on autopilot

Watches the submittal log, auto-drafts and sends follow-up emails to reviewers as turnaround dates approach, logs responses and resubmissions, and flags rejections to you — so you stop chasing an engineer three times to learn a package was rejected. You decide the recovery plan.

The result

You know where every job stands — without living in your inbox.

When submittal chasing, delivery reconciliation, and report assembly run on their own, the busywork stops capping how many jobs you can ride — and your judgment gets to the sequencing decisions instead of the spreadsheet at 6pm.

Today

You’re the chaser, the re-keyer, and the report clerk.

  • Re-typing the same revised ship date into three different systems.
  • Chasing an engineer a third time on a submittal holding a long-lead order.
  • Rebuilding the whole look-ahead because the GC moved one milestone.

With Mission

You sequence the work; the chase-and-update loop runs itself.

  • Ship dates reconcile across portal, log, and schedule on their own.
  • Submittal follow-up runs itself; only rejections and stalls reach you.
  • A re-sequenced look-ahead is drafted the moment the GC moves a date.
More
jobs ridden, same headcount

Without the chase-and-re-key tax, one coordinator can keep more jobs from falling through the cracks — lifting the contractor’s throughput ceiling.

Before
the crew is on the roof

A slip on a critical-path unit surfaces before it becomes a crew-idle event, not after the crew shows up to nothing.

Drafted
status report every Monday

The weekly status and GC look-ahead are auto-compiled from current logs, so you walk into the meeting with a draft instead of a blank page.

Safe by default

It chases and drafts — it never makes the call you didn’t approve.

Which slip to escalate, how to re-sequence the crews, and what to tell the GC stay yours. Mission is built so the agent runs the chasing, reconciling, and drafting and proposes the rest — every notification, recovery plan, and final approval waits on you before it goes out.

Connected

Works inside the tools you already run on — email, calendars, sheets, your CRM, your portals.

Approved

Anything risky or off-mission is held for your sign-off before it touches data or goes out the door.

On mission

You set the assignment once. The work stays on it for days and weeks without drifting.

Observable

You always have a clear view of what ran, what changed, and what needs a call — no transcript spelunking.

Sequence the work. Skip the chasing.

Tell us the jobs that route through you every week, and we’ll show you the submittal chasing, delivery reconciliation, and look-ahead assembly Mission would carry.